B4. Test Sequence
Atmospherics, Dynamic, and Regulatory test sets require separate units and can be processed in
parallel. EUT testing shall be performed serially within each set.
Set 1 (2 units) Set 2 (2 units) Set 3
Dynamics: Atmospherics: Safety/EMC:
1
Package Vibration
Temperature / Humidity,
Operating
EMC
2
Package Drop
Storage High Temperature /
Humidity, Non-operating
ESD
3
Un-Package Vibration Altitude, Operating Surge
4
Un-Package Shock Start Safety
5
Bench Drop