59 support@solowavedesign.com
Step 24: Door Wall Assembly
Part 1
A:Tighttothebottomof(2124)FrontFloorandushtotheoutsideedgeof(2153)Postattach(2115)
ChalkwallToptoboth(2153)Postsandboth(2154)FrontPostswith6(S7)#12x2”PanScrews,asshown
ing.24.1and24.2.
Hardware
Wood Parts
6 x #12 x 2” Pan Screw
S7
1 x Chalkwall Top 5/4 x 4 x 52”
2115
2124
Fig. 24.2
Fig. 24.1
S7
S7
S7
2115
2153
2154
Tight
Flush
2153
Front Wall