Installation
EN
bora.com 143
Fig.9.33
Inserting the activated charcoal filter through
the vent opening
u
Push the activated charcoal filter into the filter
housing until it will go no further (to do this, you can
place one finger between the slats and gradually
push the filter into the housing).
T
The end position of the activated charcoal filter is
reached when the filter has been fully pushed inside
the filter housing.
Fig.9.34
Placing the activated charcoal filter in the end
position
u
Inside the inlet opening push the filter replacement
cover until it comes to a stop in the filter housing
opening.
u
Check that the filter replacement cover is positioned
correctly.
Fig.9.35
Remove the filter replacement cover
[1]
Filter replacement cover
[2]
Inlet opening
9.8
Connecting the power
supply
u
Observe all safety and warning information
(see"2Safety").
Assembly, installation and commissioning must
always occur in line with national laws,
regulations and standards. The work must be
performed by qualified specialists who know
and comply with the additional regulations of
the local energy supply companies.
Connections via plug-in contacts (Schuko plugs)
are not permitted.
1-phase connection. The appliance complies
with the requirements of IEC 61000-3-12.
u
Open the 5 suction chamber locks.
Fig.9.36
Suction chamber locks
u
Switch off the main switch/automatic circuit breaker
before connecting the cooktop.
u
Secure the main switch/automatic circuit breaker
against being switched back on without permission.
u
Make sure the power to the appliance is
disconnected.