EasyManua.ls Logo

brent Corner Auger - TARP SYSTEM INSTALLATION AND OPERATION

brent Corner Auger
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-4
TARP INSTALLATION
250933
Fig. 2
1. Install side board extensions to box.
See page 1-6.
2. Assemble end caps (38) to front and
rear side boards. See Fig. 2.
Fig. 1
NOTE: Use a center punch to remove knock-
outs from side boards. Punch out a set of
knockouts for each bow.
3. Assemble bow brackets (25) to left
side board. See Fig. 3.
4. Assemble latch plate (32) and bow
brackets (25) to right side boards.
See Fig. 3.
5. Install bows (24) in brackets (25). See
Fig. 3.
6. Weld two halves of ridge pole (36) (see
Table 1, Step 9, for length). Install
brackets (35) and ridge pole (36) to
front and rear boards. See Fig. 3.
270917-2
Fig. 3
270917-3

Related product manuals