Installation and Operation Manual
X-VA-MT3809G-MT3810G-eng
Part Number: 541B182AAG
July, 2018
Models MT3809G & MT3810G
2-5 Installation of Flowmeter
Recommended installation for Models MT3809 and MT3810 is as follows:
a. Carefully remove the covers from each end of the owmeter. The oat
may be xed to avoid damage during transport. These plugs must be
removed before use.
b. Install the owmeter with the inlet at the bottom and the outlet at the
top.
c. When installing the owmeter in the process line, follow accepted
plumbing practices.
i. For anged meters (without lining):
Select bolts and gaskets (customer supply) in keeping with the ange
pressure rating or the operating pressure. Also note corrosion
resistance and thermal stability.
Align gasket and tighten nuts using the torques specied for the
relevant pressure ratings. Advised bolting acc. ASTM A307 Grade B
ii. For threaded meters:
Follow the applicable installation instructions for threaded
connections.
Important: ensure that thread sealing material does not get into the