3 Operation
3-1 Start-up and Operation of Flowmeter
a. After the owmeter has been properly installed in the process, it is ready
for operation. When initiating ow, slowly open the valve to avoid a ow
surge. Bypass is a help in bringing the ow on smoothly. Avoid starting a
pump to supply the owmeter without the use of a valve upstream of the
owmeter.
b. Check for leaks around the meter inlet and outlet connections. If no
leaks are present, bring the system up to operating pressure.
c. At no ow condition the indicator pointer should align with the “R” mark
on the scale. If necessary, adjust the pointer as per directions in the
Maintenance Section 4.