EasyManua.ls Logo

BRP EVINRUDE E-TEC 225 - Battery Cable Connections; Systemcheck Harness Connections

BRP EVINRUDE E-TEC 225
416 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
21
.ROUTINE SERVICE
OUTBOARD RIGGING CONNECTIONS
2
Install trunnion cover and screw. Tighten screw to
a torque of 60 to 80 in. lbs. (7 to 9 N·m).
Battery Cable Connections
Install battery cables on starter solenoid and main
ground stud.
SystemCheck Harness
Connections
Remove harness connector cover.
Before installing electrical connectors, check th at
the seal is in place. Clean of f any dirt from con-
nectors. Apply a light coat of Electrical Grease to
the seal only. DO NOT fill connectors with Electri-
cal Grease.
1. Trunnion cover and screw, throttle cable 005039
1. Positive (+) battery connection
2. Ground (–) connection
003975
1
12
003972
1. Seal 42079A
1

Table of Contents

Related product manuals