6-6
POWERHEAD
INSTALLATION
FINAL ASSEMBLY CHECK
Perform the following checks in order to ensure proper and
safe operation of the repaired unit.
• All parts removed have been returned to the original posi-
tions.
• Gearcase gear engagement is properly adjusted.
(See page 8-16)
• Fuel hose routing matches service manual illustration.
(See page 9-3 and 9-4)
• Wire routing matches service manual illustration.
(See page 9-2 to 9-4)
• No fuel leakage is evident.
• No water or oil leakage is evident during final test running.