EasyManua.ls Logo

Bruker RS - Page 38

Bruker RS
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38
ZTKS0156 / Z31820 / Rev.: 03
Assembling
Necessary Tools and Equipment
Alignment tool 1.8 mm
Bruker Vacuum Valve (Material No. Z53420)
Vacuum pumping unit
Bruker Power Supply
Bruker ACD (Automatic Cooling Device)
Precooling tube ("L-tube")
Helium transfer line
Torque wrench 5 - 50 Nm
Clean gloves
Ethanol
Polyester tape
Vacuum grease
Screw grease MOLYKOTE P1000 (supplied with the magnet stand)
Tool kit: (supplied with the CRC package)
Wrenches for Flex Lines
PTFE spray
i
Check if there is sufficient free space above the cryostat to mount the bore tubes and the
helium level sensor.
If not sufficient, mount the cryostat according following instructions at a place with
sufficient ceiling height, remove the magnet stand after assembling and transport the
cryostat to the site using the transport box.
If this is not possible, mount the magnet stand supports. For work at the bottom of the
cryostat attach the magnet stand pillars. For inserting the bore tubes or the helium level
sensor remove the magnet stand and lower the cryostat.
Contact Bruker Service head quarter for further information.

Table of Contents

Related product manuals