EasyManua.ls Logo

Bruker RS - Shimming Procedure

Bruker RS
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
83
ZTKS0156 / Z31820 / Rev.: 03
Operation
5.2.4 Shimming Procedure
1. Check the time between cycling was at least 12 hours.
2. Check the settings (current and inductivity) of the Bruker Power Supply. The current
must be the same for the shim coil and the Bruker Power Supply.
3. Switch the shim heater ON.
4. Wait 5 seconds (default setting of the Bruker Power Supply).
5. Set the shim currents according to the shimming assignment (see Appendix
Technical Data of the supplied User Manual).
6. Wait until the current is reached.
7. Leave the shim heater open for 1 minute with the correct shim current before
closing it.
8. Switch the shim heater OFF.
9. Wait 5 seconds (default setting of the Bruker Power Supply).
10. Set the current to 0 A.
11. Wait until the supply current is 0 A.
12. Continue in the same way with all shims.

Table of Contents

Related product manuals