EasyManua.ls Logo

Bruker RS - Set into Operation

Bruker RS
157 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
85
ZTKS0156 / Z31820 / Rev.: 03
Operation
5.3 Set into Operation
Mount the further equipment of the supplied magnet system respecting their manuals.
Figure 5.3: Start the Magnet Stand
Set the magnet stand into operation by switching
the pneumatic controller to UP position.
Figure 5.4: Stop the Magnet Stand
For any work at the magnet system like main-
tenance or refill of helium stop the magnet stand
by switching the pneumatic controller to DOWN
position.

Table of Contents

Related product manuals