6.3.2 HHP and HHS systems without in-rack sprinklers
NOTE:
in-rack
sprinklers
must
always
be
fully
calculated
(see
G.3).
The
water
supply
shall
be
capable
of
delivering
at
the
highest
design
point
not
less
than
the
appropriate
flow and
pressure
specified
in
table
8,
or
as
modified
in
6.3.2.1
to
6.3.2.4.
The
total
requirement
for
the
pressure
at
the
control
valve
set
shall
be
the
sum
of
the
pressure
at
the
design point,
the
pressure
equivalent
of
the
difference
in
height
between
the
control
valve
set
and
the
highest sprinkler
downstream
of
the
design
point
and
the
pressure
loss
for
the
flow
in
the
piping
from
the
control valve
set
to
the
design
point.
T
Table 8: Pressure and flow requirements for installations designed using Tables G11 to G14
Design
density
mm/min
Flow
required l/min
Pressure
at
the
highest
design
point bar
Area
of
operation
per
sprinkler
m²
Wet
or
pre-
action
Dry
or
alternate
6
7
8
9
(1)
With
pipe
diameters
in
accordance
with
Tables
G11
&
G12
and
sprinklers
having
a
K
factor
of
80
7,5
10,0
2
300
3
050
2
900
3
800
-
1,80
-
2,25
3,90
(2)
With
pipe
diameters
in
accordance
with
Tables
G11
&
G13
and
sprinklers
having
a
K
factor
of
80
7,5
10,0
2
300
3
050
2
900
3
800
-
1,30
-
1,80
1,35
2,35
1,75
3,00
(3)
With
pipe
diameters
in
accordance
with
Table
G13
&
G14
and
sprinklers
having
a
K
factor
of
80
7,5
10,0
2
300
3
050
2
900
3
800
-
0,70
-
0,95
0,70
1,25
0,90
1,60
(4)
With
pipe
diameters
in
accordance
with
Tables
G13
&
G14
and
sprinklers
having
a
K
factor
of
115
10,0
12,5
15,0
17,5
20,0
22,5
25,0
27,5
30,0
3
050
3
800
4
550
4
850
6
400
7
200
8
000
8
800
9
650
3
800
4
800
5
700
6
000
8
000
9
000
10
000
11
000
12
000
-
-
0,95
1,25
1,65
2,05
2,55
3,05
3,60
-
0,90
1,25
1,70
2,25
2,85
3,50
4,20
4,95
-
1,15
1,65
2,25
2,95
3,70
4,55
5,50
6,50
0,95
1,45
2,10
2,80
3,70
4,70
5,75
6,90
-
6.3.2.1
Where
the
area
of
the
HHP
or
HHS
portion
of
an
occupancy
is
less
than
the
area
of
operation,
the
flow
rate
in
Table
8
can
be
proportionately
reduced,
(see
6.3.2.5),
but
the
pressure
at
the
highest
sprinklers
in
the
area
shall
either
be
equal
to
that
shown
in
the
table
for
the
appropriate
flow
rate
or
be
determined
by hydraulic
calculation.
6.3.2.2
When
the
HHP
or
HHS
portion
of
occupancy
involves
less
than
48
sprinklers,
the
flow
rate
and

Table of Contents