Table 18: Minimum pump characteristics for LH and OH (pre-calculated systems)
Hazard class
Sprinkler height
h above the
control valve
set(s)
m
Nominal data
Characteristic
Pressure
bar
Flow l/min
Pressure
bar
Flow l/min
Pressure
bar
Flow l/min
LH wet or pre-
action
h ≤ 15
15
<
h ≤ 30
30
<
h ≤ 45
1,5
1,8
2,3
300
340
375
3,7
5,2
6,7
225
225
225
-
-
-
-
-
-
OH1 wet or
pr
e-action
h ≤ 15
15
<
h ≤ 30
30
<
h ≤ 45
1,2
1,9
2,7
900
1 150
1 360
2,2
3,7
5,2
540
540
540
2,5
4,0
5,5
375
375
375
OH1 dry or
alt
ernat
e OH2
w
et or pre-
action
h ≤ 15
15
<
h ≤ 30
30
<
h ≤ 45
1,4
2,0
2,6
1 750
2 050
2 350
2,5
4,0
5,5
1 000
1 000
1 000
2,9
4,4
5,9
725
725
725
OH2 dry or
alt
ernativ
e OH3
w
et or pre-
action
h ≤ 15
15
<
h ≤ 30
30
<
h ≤ 45
1,4
2,0
2,5
2 250
2 700
3 100
2,9
4,4
5,9
1 350
1 350
1 350
3,2
4,7
6,2
1 100
1 100
1 100
OH3 dry or
alt
ernat
e OH4
w
et or pre-
action
h ≤ 15
15
<
h ≤ 30
30
<
h ≤ 45
1,9
2,4
3,0
2 650
3 050
3 350
3,0
4,5
6,0
2 100
2 100
2 100
3,5
5,0
6,5
1 800
1 800
1 800
NOTE
1:
the
pressures
shown
are
as
measured
at
the
control
valve
set(s)
NOTE
2:
In
the
case
of
buildings
which
exceed
the
heights
shown,
it
shall
be
proved
that
the
pump characteristics
are
adequate
for
supplying
the
flows
and
pressures
specified
in
6.3.1.
9.7.3
Pre-calculated
systems
-
HHP
and
HHS
with
no
in-rack
sprinklers
The
nominal
pump
flow
and
pressure
for
HHP
and
HHS
pre-calculated
systems
shall
conform
to
6.3.2.
In
addition
the
pump
shall
be
capable
of
supplying
140%
of
this
flow
at
a
pressure
of
no
less
than
70%.
9.7.4
Calculated
systems
The
rated
duty
of
the
pump
shall
be
a
function
of
the
most
unfavourable
area
curve.
When
measured
in
the supplier's
test
facility,
the
pump
shall
provide
a
pressure
at
least
0.5
bar
higher
than
that
required
for
the
most unfavourable
area.
The
pump
shall
also
be
capable
of
providing
the
flow
and
pressure
of
the
most unfavourable
area
at
all
water
supply
water
levels
(see
annex
H).
9.7.5 Pressure and water capacity of boosted town mains
If
it
is
intended
to
connect
a
pump
to
a
town
main,
a
test
shall
first
be
carried
out
to
show
that
it
can

Table of Contents