3 Installation
For you own control and in order to get a better overview, we recommend that you
follow the sequence of steps outlined below and tick the individual steps off after they
have been completed.
3.1 Checking the delivery
Please check that the delivery is complete and undamaged. Please notify any
transport damage immediately.
3.2 Assembly of the system
The CF Control 100 should be installed in a protected, easily accessible location in
the plant room, preferably at eye level. To ensure proper opening of the device
housing, there should be no objects within 10 cm of the mounting plate (all around).
The installation position of the dosing pumps must not be higher than 1.6 m from the
lowest level of the dosing tanks.
Power supply of the measuring and control unit via power cord with Schuko plug.
CAUTION: Switch the supply voltage off before opening the equipment.
CAUTION: Before the supply voltage is connected, is must be ensured that the
vo
ltage is turned off.
WARNING: Do not use or store volatile acids in the immediate vicinity of the unit.
The use of concentrated hydrochloric acid in the immediate vicinity of our
equipment invalidates the guarantee!