Operating instructions
CF Control 100
The switching marks can be set in any sequence; you have to observe, however, that
the filter times do no overlap and the switching status On or Off alternate in
chronological order, e.g.
Switching mark 3 10:00 OFF
Switching mark 1 08:00 ON
Switching mark 4 16:00 ON
Switching mark 2 22:00 OFF
In this example, the filter pump would run daily from 8:00 to 10:00 and from 16:00 to
22:00.
9.3 24h operation
Set the following switching marks for a 24 h-operation of the filter system:
Parameters
22
Switching mark 1 condition
27
Switching mark 2 condition
32
Switching mark 3 condition
37
Switching mark 4 condition
Warning: If the pump should run for 24 hours, always set this as described before,
button for a longer time.