EasyManua.ls Logo

Circutor CVM-C10 - MEASURING SINGLE-PHASE NETWORKS, PHASE TO PHASE, WITH A 2-WIRE CONNECTION, CVM-C10-ITF, CVM-C10-MC AND CVM-C10-mV MODELS.

Circutor CVM-C10
94 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.5.12.- MEASURING SINGLE-PHASE NETWORKS, PHASE TO PHASE, WITH A 2-WIRE
CONNECTION, CVM-C10-ITF, CVM-C10-MC AND CVM-C10-mV MODELS.
Measurement system:
Power
Supply
V
L1 VL2
L1
L2
POWER SUPPLY
INPUTS
A(+) B(-)
GND
RS485
S1 S2
S1 S2
S1 S2
L1
P1 P2
L2
L3
300V
~
Ph-NPh-Ph
520V
~
NV
L3L2
V
L1
V
P1 P2
P1 P2
I1 I2
OUTPUTS
Rc R2 R1 Tc T2 T1
S0-
S0+ S0+
VL1
VL2
a b
A B
S1 S2
P1
P2
LOAD
Figure 15: Measuring Single-Phase Networks, phase to phase, with a 2-wire connection, CVM-C10-ITF, CVM-C10-MC
and CVM-C10-mV models.
CVM-C10-ITF model:
The transformer secondary value must be 5A or 1A
CVM-C10-MC model:
The MC transformer secondary value is set to 0.250 A (xed value)
CVM-C10-mV model:
The transformer secondary value must be 0.333 V
26
CVM-C10
Instruction Manual

Table of Contents

Related product manuals