EasyManua.ls Logo

Cirrus DESIGN SR22T - Normal Procedures; Preflight Inspection

Cirrus DESIGN SR22T
512 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-4 P/N 13772-003
Section 4 Cirrus Design
Normal Procedures SR22T
Normal Procedures
Preflight Inspection
Before carrying out preflight inspections, ensure that all required
maintenance has been accomplished. Review your flight plan and
compute weight and balance. Throughout the walk-around: check all
hinges, hinge pins, and bolts for security; check skin for damage,
condition, and evidence of delamination; check all control surfaces for
proper movement and excessive free play; check area around liquid
reservoirs and lines for evidence of leaking.
In cold weather, remove all frost, ice, or snow from fuselage, wing,
stabilizers and control surfaces. Ensure that control surfaces are free
of internal ice or debris. Check that wheel fairings are free of snow and
ice accumulation. Check that Pitot probe warms within 30 seconds of
setting Pitot Heat to ON.
1. Cabin
a. Required Documents................................................ On Board
b. Avionics Power Switch.......................................................OFF
c. Bat 2 Master Switch ........................................................... ON
3
1
5
6
7
8
9
10
11
12
13
4
2
SR22_FM04_1454
Original Issue

Table of Contents

Related product manuals