EasyManua.ls Logo

ComAp InteliMains NT IM-NT-BB - Group: Power Management

ComAp InteliMains NT IM-NT-BB
437 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf, ©ComAp April 2015
320
12.1.6.3 Value: Max ROCOF
Group
Mains protect
Units
Hz/s
Related FW
standard v3.1.0
Description
This is maximal measured value of ROCOF of the mains voltage. The value
is reset to 0 automatically at the moment of closing the MGCB.
12.1.7 Group: Power management
12.1.7.1 Value: TotRunPact
Group
Pwr management
Units
kW
Related FW
standard v3.1.0
Description
Sum of active power of all loaded gen-sets within the group that are
connected to the bus.
12.1.7.2 Value: TotRunPnomAll
Group
Pwr management
Units
kW
Related FW
standard v3.1.0
Description
Sum of nominal power of all loaded gensets within the group that are
connected to the bus (e.g. all gensets in logical group controlled by IM-NT or
in two logical groups linked by Group link). See also values TotAvlbPnom and
TotRunPnom.
For more information on power management please refer to the chapter
Power management.
12.1.7.3 Value: TotAvlbPnom
Group
Pwr management
Units
kW
Related FW
standard v3.1.0

Table of Contents