InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf, ©ComAp – April 2015
11.2.8.10 Setpoint: MGCB Close Del
This setpoint adjust the delay that is counted down before MGCB is closed in
Island operation. This can be used to postpone immediate closing of all
MGCBs in complex system to prevent sudden load jump.
WARNING!
Once the controller is in the process of delay countdown it will not close MCB
even if the Mains goes OK again. The delay is counted down and then
MGCB is closed and standard transition sequence continues.
11.2.9 Group: Pwr management
11.2.9.1 Setpoint: #Pwr mgmt mode
ABS(kW), ABS(kVA), REL (%) [-]
The power management is based on actual sum of active
power of gen-sets participating in the power management
in particular control group (TotRunPact) and sum of active
nominal power of gen-sets participating in the power
management in particular control group (TotRunPnom).
Setpoints #LoadResStrt X (e.g. LoadResStrt 1) and
#LoadResStop X (e.g. LoadResStop 1) are set in absolute
values in kW.
The power management is based on actual sum of
apparent power of gen-sets participating in the power
management in particular control group (given by
TotRunPact and total reactive power, S^2 = P^2 + Q^2)
and sum of apparent nominal power of gen-sets