EasyManua.ls Logo

Comtech EF Data CSAT-5060 - Appendix A. CSAT-5060 5 to 25 Watt INSTALLATION; Unpacking and Inspection; Man-Power; Tools Required

Default Icon
226 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A–1
Appendix A. CSAT-5060 5 to 25 Watt
INSTALLATION
IMPORTANT
Upon completion of installation, refer to Chapter 8
for LNA installation.
A.1 Unpacking and Inspection
Inspect the shipping container for damage:
Retain shipping container and packing materials for possible re-shipment.
Checked to determine that all parts, materials and documentation has been shipped
with the converter.
Inspect converter for possible damage, and then test for proper operation.
If the shipment is incomplete, or there is mechanical damage, or the converter
does not operate properly:
Notify the Comtech EF Data Customer Service representative immediately.
If there is damage to the shipping container:
Notify the carrier, and retain all shipping materials for inspection by the carrier.
A.1.1 Man-Power
Comtech EF Data recommends that two technicians be required to install any of the
following installations.
A.1.2 Tools Required
The following tools are recommended for unit installation.
Qty. Description
1
1
1
Adjustable Wrench
Alternate: Set of various box wrenches
Phillips® - Head Screwdriver
Tin Snips

Table of Contents