EasyManua.ls Logo

Daher TBM 930 - Page 780

Daher TBM 930
877 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Pilot's Operating Handbook
Supplement 6
WX-500 stormscope
Edition 3 - December 31, 2015
Rev. 2
Page 9.6.3
SECTION 3
Eme
rgency procedures
Installation and operation ofWX-500 stormscope do not change the basic emergency
procedures of the airplane described in section 3 Emergency procedures of the basic
POH.
SECTION 4
Normal procedures
Normal operating procedures of the WX-500 stormscope are outlined in the WX-500
Pilot's Guide.
SECTION 5
Per
formance
Installation and operation of WX-500 stormscope do not change the basic
performance of the airplane described in section 5 Performance of the basic POH.
PIM - DO NOT USE FOR FLIGHT OPERATIONS

Table of Contents

Related product manuals