2.3.7
AVR information
To avoid delays during commissioning, ensure that the manufacturer's information is available for each AVR that the
controllers will regulate. This information should include:
• Instructions on setting the AVR initial voltage.
• Instructions on setting the AVR control range.
• AVR characteristics. For example, for a relay controlled AVR: The effect of the number of pulses and the pulse length.
• The voltage droop, and how to adjust it.
PPU 300 Commissioning guidelines 4189341106 UK
www.deif.com Page 17 of 75