EasyManuals Logo

Delta ASDA-B2 Series User Manual

Delta ASDA-B2 Series
345 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #97 background imageLoading...
Page #97 background image
Chapter 5 Trial Operation and Tuning ASDA-B2
5-6 Revision May, 2018
(7) When the screen displays:
Warning of under voltage:
Corrective actions:
Check if the wiring of main circuit input voltage is correct.
Use voltmeter to measure if the main circuit voltage is normal.
Use voltmeter to measure if the power system complies with the specification.
Note: During the process of power on or servo on, if an alarm occurs or shows any
abnormal display, please contact the distributors.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Delta ASDA-B2 Series and is the answer not in the manual?

Delta ASDA-B2 Series Specifications

General IconGeneral
BrandDelta
ModelASDA-B2 Series
CategoryServo Drives
LanguageEnglish

Related product manuals