EasyManua.ls Logo

Delta M70A

Delta M70A
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
55
Installation and Operation Manual for Solar Power Inverter M70A EU V1.1 EN 2020-02-20
7 Installation
Grounding the inverter housing
7.4.2 Grounding via the PE screw of the AC con-
nection
1. Screw the PE/PEN cable onto the PE screw (torque:
14.7 Nm). M8 nut, spring washer and washer are pro-
vided.
2. Perform a continuity check of the grounding connection.

Table of Contents

Related product manuals