Installation and Operation Manual for Solar Power Inverter M70A EU V1.1 EN 2020-02-20
7 Installation
Completing electrical installation
7.12 Completing electrical installation
If you have connected a PC for commission-
ing (see “7.7.7 Connecting a PC via RS485
(optional)”, page 76), you must disconnect the
PC from the inverter again after commissioning
(see “8.4 Commissioning with the Delta Service
Software (DSS)”, page 97)!
1. Remove the Allen key from the top of the door.
2. Close the door.
3. Close the upper and lower door locks.