EasyManua.ls Logo

Devatec ELECTROVAP MC2 - Installation Steps Overview; Step 1: Placing and Wall Attachment; Step 2: Water Connection; Step 3: Steam Nozzle and Sensor Positioning

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10 Pictures for illustrating purposes only
ELECTROVAP MC2 STEAM BATH
Installation steps
All works concerned with electrical installation must be carried out by a skilled and
qualified personnel.
Please read, heed and follow the enclosed information for the installation of the
humidifier and the steam, water and electrical networks.
For further technical assistance, feel free to call devatec.
Failure to adhere to manufacturers installation recommendations will invalidate
your warranty.
Installation steps
Step 1 - Placing and wall attachment
Step 2 - Water connection
Step 3 - Steam nozzle and temperature sensor positioning
Step 4 - Draining outlet
Step 5 - Temperature sensor and options
Step 6 - Electrical connections
Step 2
Step 3
Step 4
Step 6
Step 1
Step 5

Table of Contents