D439E Service Manual 2. Engine Mechanical System (D439E)
47
8. Install the front oil seal slinger (1).
9. Install the front timing gear case (1).
Tightening torque : 21.6 ~ 32.3 Nm
(2.2 ~ 3.3 kgf.m, 16 ~ 24 Ib-ft)
CAUTION
a. Apply the Loctite #5699 or equivalent on the
assembly surface of timing gear case (1), and
then assemble it within 3 minutes.
b. Do not start the engine within 1 hour after
installing the timing gear case.
10. Install the power steering pump (1).
11. Install the water pump pulley (1) and water pump
assembly (2).

Table of Contents

Other manuals for Doosan D55C-5

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Doosan D55C-5 and is the answer not in the manual?

Doosan D55C-5 Specifications

General IconGeneral
BrandDoosan
ModelD55C-5
CategoryEngine
LanguageEnglish

Related product manuals