EasyManua.ls Logo

DURKOPP ADLER 669 ECO - Performing a Test Run

DURKOPP ADLER 669 ECO
118 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setup
104 Operating Instructions 669 - 00.0 - 08/2019
Fig. 66: Setting the operating pressure
To set the operating pressure:
1. Pull the pressure controller (1) up.
2. Turn the pressure controller until the pressure gage (2)
indicates the proper setting:
Increase pressure = turn clockwise
Reduce pressure = turn counterclockwise
3. Push the pressure controller (1) down.
6.15 Performing a test run
When setup is complete, perform a test run to check the function-
ality of the machine.
(1) - Pressure controller (2) - Pressure gage

Table of Contents

Related product manuals