The following card may be printed, laminated, and placed near the Minuteman. Great for the changeover
tech.
Pre-Run Setup
Follow bar feed and lathe manufactures
instructions on machine changes
All bar feed and Lathe safety’s installed and
Air pressure set at 75-90 PSI (5-6 bar)
Proper oil viscosity and oil level set
Remnant tray empty
Correct guide channels installed
Correct pusher size and corresponding guide
channel installed
Install corresponding lathe spindle liner
Adjust roller steady (Only if roller steady used)
Adjust movable roller steady (Only if roller
Install appropriate steady blocks for bar stock
diameter (If blocks are used)
Install corresponding telescoping nose or hard
nose and appropriate inserts
Correct collet for bar stock diameter installed
Part program parameters programmed in bar
Bar stock loaded into magazine and positioned
to rear