EasyManua.ls Logo

elco TRIGON L PLUS - Installation; Boiler Transport and Handling

elco TRIGON L PLUS
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
17
Installation
Boiler transport
1. Remove the plastic strip.
2. Open the 4 upper folders, and remove the documentation
and the condense pipe.
3. Removethecartoninserts,removethecartonbox.
4. Removethe4screwsfromthebottompartoftheboilerand
fromtherollo󰀨railsonthepallet.
5. Positionandxtherollo󰀨railonthepallet,pushtheboiler
forwardalongtherollo󰀨railtotheground.
6. Movetheboilertotheconnectionortothecascaderack.
7. Remove the water and gas plastic cap, connect the condense
pipe, and follow the installation manual.
8. Whentheboilerisconnected,pushthefourbrakestoblockit.
The TRIGON L PLUS is a fully
equipped compact heating system,
whichhasbeenpre-setandtestedat
the factory.
The package dimensions for all
appliances are:
Width 750mm
Height 1200mm
Depth 800mm
Thismakesitpossibletotransport
all models in one piece through a
normal door.
Theboilercanbemovedusinga
fork-lift or pallet truck.Unpacking
instructions are printed on the
cardboardbox.Pleasefollowthe
proposed steps.
Disassembly of panelling
The appliance casing panels can
beeasilyremovedandthisis
recommended while the appliance is
beinginstalled.Thislimitsthepotential
for damage to occur.
Handling and carrying precautions:
- Wear protective clothing and gloves
to protect from any sharp edges.
- Theboilershouldbehandledwithits
pallet using a fork lifter, wheels can
beusedfornalpositioning.
Panelling should be attached and
secured with the supplied screw,
after assembly of the boiler, or after
maintenance works.
1
4x4x
4x4x
4
2
7
2x2x
5
3
A
B
C
6

Table of Contents