17
Installation
Boiler transport
1. Remove the plastic strip.
2. Open the 4 upper folders, and remove the documentation
and the condense pipe.
3. Removethecartoninserts,removethecartonbox.
4. Removethe4screwsfromthebottompartoftheboilerand
fromtherollorailsonthepallet.
5. Positionandxtherollorailonthepallet,pushtheboiler
forwardalongtherollorailtotheground.
6. Movetheboilertotheconnectionortothecascaderack.
7. Remove the water and gas plastic cap, connect the condense
pipe, and follow the installation manual.
8. Whentheboilerisconnected,pushthefourbrakestoblockit.
The TRIGON L PLUS is a fully
equipped compact heating system,
whichhasbeenpre-setandtestedat
the factory.
The package dimensions for all
appliances are:
Width 750mm
Height 1200mm
Depth 800mm
Thismakesitpossibletotransport
all models in one piece through a
normal door.
Theboilercanbemovedusinga
fork-lift or pallet truck.Unpacking
instructions are printed on the
cardboardbox.Pleasefollowthe
proposed steps.
Disassembly of panelling
The appliance casing panels can
beeasilyremovedandthisis
recommended while the appliance is
beinginstalled.Thislimitsthepotential
for damage to occur.
Handling and carrying precautions:
- Wear protective clothing and gloves
to protect from any sharp edges.
- Theboilershouldbehandledwithits
pallet using a fork lifter, wheels can
beusedfornalpositioning.
Panelling should be attached and
secured with the supplied screw,
after assembly of the boiler, or after
maintenance works.
1
4x4x
4x4x
4
2
7
2x2x
5
3
A
B
C
6