EasyManua.ls Logo

elco TRIGON L PLUS - Inspection

elco TRIGON L PLUS
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
81
Caution:
After panelling removal, 230V
parts can be reached. Boiler
inspection is only to be carried
out by qualied sta󰀨.
Removal of frontal panelling
Thefrontpanellingmustrstbe
removed,tobeabletocarryout
maintenanceontheboiler.
1. Unscrew the 2 screws of quick-
locks on top of frontal panel (A).
Push the quik locks (B) and remove
thefrontalpanel(C),(D)(=airbox).
Removal of top panelling
Toppanellingmustberemovedtobe
abletoreachtheburnercontrolunit.
2. Pressbothexternalsidesofthe
control unit HMI (E) and rotate
the display (F).
3. Pull the top panelling in a forward
motion (G), (H).
Commissioning
Inspection
The panelling of the equipment
consists of metal and plastic parts,
whichcanbecleanedwithamild
(non-aggressive) cleaning agent.
When carrying out maintenance works,
only original ELCO replacement parts
maybeused.
Checks prior to commissioning
Changingsettingssuchasburner
pressure and setting the amount
of air is not necessary.
Only in the case of failures or
replacement of the gas unit, venturi
and/or ventilator, does one have
to check and adjust the O
2
/ CO
2
percentage accordingly.
Following maintenance tasks
always check all gas-conducting
components on leakages by use
of leakage detection uid (LDF).
(2x)(2x)
A
C
B
D
E
G
H
H
F
1
2
3

Table of Contents

Related product manuals