29
Installation
Gas line
The gas line leading to the installation
hastobecalculatedtothemaximum
capacity to determine the diameter of
the supply pipe.
Thegaslinehastobeplacedonthe
allocatedopeningsoftheupperbracket
of the cascade rack and secured on all
angeplatesbythespecialM6x8x16
closetolerancebolts.
Pressure loss for a newly installed
naturalgaslinemaybe1.7mbarmax.
In the case of an extension, this may
be2.5mbarmax.Thisvalueistobe
measuredinbetweentheoperational
gasmeterandtheCH-boilers.
Forcorrectfunctioningoftheboilers,it
is necessary that the gas dynamic inlet
pressuremustbeatleast19mbars.
Thisvalueistobemeasuredinfrontof
thegasangeconnection.
With regard to new lines in particular,
ensure that the gas line does not
contain any residual pollution.
ATTENTION:
For use with propane gas, the LPG
conversion kit has to be installed,
see separate conversion instructions.
Following maintenance tasks always
check all gas carrying components
for leakages by using of leakage
detection uid (LDF).