Commissioning
Flue gas analysis
Full load (Step 1/3)
Legend
1. Measuringpointfortheuegas
probe.
Step 1: Check on full load
Step 2: Check on low load
Step 3: Adjustment (if necessary).
Step 1: O
2
/ CO
2
check on full load
The O
2
or CO
2
setting is preset at the
factory to E, namely natural gas, for all
equipmentunits.AcalibratedO
2
or CO
2
controlmeasurementmustbecarried
out during commissioning.
- Ensurethattheboilerisin
operation and that the heat, which
itproduces,canbedischarged.
Set the load of each engine
- Pressthechimneysweepbuttonfor
5seconds;
- Select with “+” or “–”burner1or2
(incaseitispresent).PressOK;
- TheboilerwillswitchtoCHpower
shown on the screen.
The modulation rate can now be
adjusted between minimum 0%
and maximum 100%.
- Press the “+”buttonuntilyoureach
100%;
- Press OK;
The selected engine will switch
to max power output, the screen
shows 100% (heating capacity).
- CalibratetheFlueGasAnalyser,
andtheninserttheuegasprobe
of the Flue Gas Analyser into the
measuringpointoftheuegaspipe
“1”(seeillustration);
- Wait for one minute and then carry
outacombustionanalysis;
- Check whether the O
2
/CO
2
values
thatarelistedbelowcorrespondto
the measured value.
Afterthischeckhasbeendone,once
more test the O
2
/CO
2
value at low load
(see Step 2 on page 84). If there are
any deviations in the result, then these
mustbecorrected(seeStep3on
page 85).
The O
2
/ CO
2
check consists of 2 steps or, if necessary, 3 steps:
5 sec.
1
Set the load of complete boiler
- Pressthechimneysweepbutton
for5seconds;
- Select with “+” or “–”burner1+2
The Chimney Power Level is now
Settable (with “+” and “–” buttons)
between the minimum Power and
the maximum Power of the complete
boiler.
O
2
/ CO
2
check on full load (Step 1)
Full load Natural gas (G20) Propane (G31)*
O
2
Nominal 4,8% Nominal 5,0%
Minimum 4,1%, maximum 5,6% Minimum 4,5%, maximum 5,4%
CO
2
Nominal 9,0% Nominal 10,5%
Minimum 8,6%, maximum 9,4% Minimum 10,2%, maximum 10,8%
Valuesarevalidwithclosedcover/airbox. *onlypossibleifLPGconversionkitisinstalled