Commissioning
BA_Elmasteam_8_Vers.07.2016 © Elma Schmidbauer GmbH
Figure 4.5.5: Water hose and cable
The hoses and cables in the canister are pre-assembled. It may be
that these have been displaced during transport or unpacking.
Inspect hose (K) and cable (L). Align these when necessary to the
same level (M) when they have been displaced.
INFORMATION
Pump Operation
• The trouble-free functioning of the pump operation
is guaranteed when water hose (K) and cable (L)
are set to the same level (M) (Figure 4.5.5)
Level for the water
connection and
filling level cable