Handling in Operation
BA_Elmasteam_8_Vers.07.2016 © Elma Schmidbauer GmbH
The commissioning was executed (Chapter 4)
The pressure vessel was filled (Chapter 6).
The device is switched on at the mains supply switch!
The device is ready for use!
Set the programme for soft, strong, steam outlet on the
programme selection.
Soft
setting for the steam range 4-6 bar (Chapter 7.4.2).
Strong
setting for the steam range 6-8 bar (Chapter 7.4.3).
Steam Outlet
for discharging residual steam pressure (Chapter
7.4.1).
Saturated Steam (optional)
the saturated steam proportion will
be set by the rotary knob wet/dry (Chapter 7.3)
INFORMATION
The device has been pre-set at the factory. Amending
the factory settings (Chapter 7.4.6 Settings).
Figure 7.1: Gauge
The device has achieved the operating pressure when all the
pressure values illuminate until the operating pressure green. (e.g.
at 4 bar operating pressure, the scale of values illuminates as 1-4
on the gauge (Figure 7.1).
INFORMATION
To prevent accidental steam outlet, turn off the device
during application breaks to
lock (Chapter 7.4.4).
Pressure vessel is
filled
soft / strong /
steam outlet