EasyManua.ls Logo

Endress+Hauser analytikjena PlasmaQuant 9100 - Installing the Isomist XR Temperature-Controlled Spray Chamber

Endress+Hauser analytikjena PlasmaQuant 9100
87 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PlasmaQuant 9100 (Elite) Installation and commissioning
41
The operator can set the following parameters within the specified ranges in the
Au-
tosampler
window in the
Dilute
tab:
¡ Max. dilution factor and Min. dilution factor
¡ Vessel wash cycles
¡ Vortexing speed
¡ Air gap volume
¡ Aspiration speed diluent, Aspiration speed sample and Dispense speed
¡ Syringe delay
When the sampler, the dilution system and the switching valve are coupled, the opera-
tor controls the switching valve via the ASpect PQ
software.
Adjust the following settings in the analysis system during switching valve commission-
ing: (These settings do not usually require changes during operation.)
¡ Loop Rinse Delay and Extra Loop Rinse
¡ Loop Evacuation Delay and Loop Load Time
¡ Equalization Delay
¡ Time To Evacuate Probe and Probe Wash
¡ Rinse Station Fill
When operating the sample and switching valve without the dilution system:
} Install the Dashboard software, see user manual of the accessory.
} Operate the switching valve in automatic mode (default).
} During commissioning: Adjust settings such as
Loop Rinse Delay
in the analysis sys-
tem via the Dashboard
software.
4.4.2 Installing the IsoMist XR temperature-controlled spray chamber
CAUTION
Risk of frostbite
The spray chamber and the inner surfaces of the Peltier element can become very cold
(temperature range: -25 °C to +80 °C
).
¡ Do not touch the spray chamber or Peltier element during or directly after operation.

Table of Contents

Related product manuals