Transport and storage PlasmaQuant 9100 (Elite)
80
} Reattach the cover plate in front of the connections on the left rear side of the de-
vice.
} Switch on the device and start the control software on the PC.
8.6 Installing the recirculating chiller
NOTICE
Risk of device damage due to incorrect operation of the recirculating chiller
¡ Observe the operating manual of the recirculating chiller.
¡ Always use the Analytik Jena AG cooling water additive for the cooling water.
} Connect the device and the recirculating chiller with the cooling water hoses:
For easier distinction, one of the hoses is marked with hose clips at both ends.
– Cooling water inlet flow connection on the recirculating chiller with the "In" con-
nection on the device
– Cooling water outlet flow connection on the recirculating chiller with the "Out"
connection on the device
} Connect the recirculating chiller to power and switch it on.
For the water-water cooler, install the cooling water circuit on the building side.
} Prepare the cooling water (→ "Maintenance of the recirculating chiller: Replacing the
cooling water" 76):
– Start the ASpect PQ control software and start the wizard for replacing the cool-
ing water.
– Switch on the emission spectrometer.
– Fill cooling water with the assistance of the wizard. Skip the part in the wizard on
draining the cooling water.
} Set the following parameters on the recirculating chiller:
– Temperature: 18 °C
– Set the cooling water pressure so that a water inlet flow of at least
1.5 to 2.0 l/min
is achieved. The maximum pressure must not be exceeded here.
Pressure (max.): 600 kPa (6 bar)