Promag 53 PROFIBUS-DP/-PA 6 Commissioning
Endress+Hauser 85
6 Commissioning
6.1 Function check
Make sure that all final checks have been completed before you start up your measuring
point:
• Checklist for “Installation check” → Page 44
• Checklist for “Electric connection check” → Page 62
Note:
• The technical function data of the PROFIBUS interface in acc. with IEC 61158-2 must
be maintained (FISCO model).
• The bus voltage of 9 ... 32 V and the current consumption of 11 mA at the device can
be checked using a normal multimeter.
• Using the LED on the I/O board (see Page 113) it is possible to carry out a simple
function check on the fieldbus communication in the non-hazardous area.
Switching on the device
Once the connection checks (see Page 62) have been successfully completed, it is
time to switch on the power supply. The device is now operational.
The measuring device performs a number of power on self-tests. As this procedure
progresses the following sequence of messages appears on the local display:
Normal measuring mode commences as soon as start-up completes. Various measured
values appear on the display (HOME position).
Note:
If start-up fails, an error message indicating the cause is displayed.
PROMAG 53
START UP
IS RUNNING
Start-up message
PROMAG 53
SW-AMPLIFIER
XX.XX.XX
Current software version
SYSTEM OK
→ OPERATION
Beginning of normal measuring mode