Maintenance TOCII CA72TOC
96 Endress+Hauser
7.9.2 Power flush
During a power flush, the strip chamber and separation chamber are flushed with the connected
pressurized water via solenoid valve MV2.
a0012478
Fig. 53: Position of the strip and separation chamber
Power flushing runs automatically after startup, and can be started in three ways:
• Activated manually
• Activated remotely
• Activated automatically
Operation starts automatically on completion of the power flush process.
Step Display Description
1
PUMPS
CALIBRATION
SERVICE
CLEANING
FILTERS
SCREEN FLUSH
POWER-FLUSH
BYPASS-SCREEN
STRIPPER+SEPARATION
OPEN GAS CICUIT
COMBUSTION PIPE
LEAKAGE TEST