EasyManua.ls Logo

Enterasys SecureStack C2 C2G124-48P - Chapter 3: Hardware Installation; Considerations Prior to Installation; Required Tools; Unpacking the Switch

Enterasys SecureStack C2 C2G124-48P
82 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to Installation
Wheninstallingtheswitch,notethefollowing:
•Beforestartingtheinstallationprocedure,notify thenetworkadministratorofthe
installation.
•Followthe installationproceduresintheorderaspresentedinthisguide.
•Donotconnecttheswitchtothenetworkuntilyouhave establishedthecorrectIP
address.
Required Tools
APhillipsscrewdriverisrequiredtoinstalltheswitchintoarack.
Unpacking the Switch
Unpacktheswitchasfollows:
1. Opentheboxandremovethepackingmaterialprotectingtheswitch.
2. Verifythatthecontents ofthecartoncontainstheitemslistedinTable 31.
3. Removethetapesealonthenonconductivebagtoremovetheswitch.
4. Performavisualinspectionoftheswitchforany
signsofphysicaldamage.Contact
Enterasys N etworksifthereareanysignsofdamage.RefertoGettingHelpon
page 1 7fordetails.
Table 3-1 Contents of Switch Carton
Item Quantity
Switch device 1
Rack mounting bracket 2
M3x6-mm flathead screws 8
Rubber feet with adhesive backing for installation on a flat surface 4
AC power cord (The type of power cord is country dependent.) 1
This installation guide 1
Customer Release Notes 1
URL notice card 1

Table of Contents

Related product manuals