Configuring Switches in a Stack
SecureStack C2 Installation Guide 3-13
2. SwitchIDsaresavedagainsteachmodule.Then,everytimeaboardispowercycled,
itwillinitializewiththesameswitchID.Thisisimportantforportspecific
information(forexample:ge.4.12isthe12thGigabitEtherne tportonswitch#4).
3. Themanagementelectionprocessusesthefollowingprecedence
toassigna
managementdevice:
a. Previously assigned/electedmanagementswitch
b. Managementassignedpriority(values115)
c. Hardwarepreferencelevel
d. HighestMACAddress
Recommended Procedures to Install New and Existing Stacks
Installing a New Stackable System of Up to Eight Switches
Usethefollowingproceduretoinstallanewstackofuptoeightswitchesoutofthebox.
Beforeapplyingpower,makeallphysicalconnectionswiththestackcablesasdescribed
inConnectingHighSpeedSta c kingCablesonpage 310.
1. Onceallofthestackcableshavebeenconnected,individually
poweroneachswitch
fromtoptobottom (connectingpowertoaswitchisdescribedinConnectingACand
PoEPoweronpage 315).
Iftheswitchesarepoweredonalmostsimultaneously,thesy stemwillautomatically
selectthefirstonethatpowersupastheMasterswitchandthe
othersasMember
switches.TheswitchesareassignedunitIDsintheorderthattheybecomefully
operational.
YoucancontroltheunitIDassignmentaccordingtothephysicalpositioninastack.
Whenyoupowerupeachswitchandallowittobecomefullyoperationalbefore
applyingpowertothe
nextswitch,thefirstonebecomestheManagerandallthenext
switcheswilljointhatstack(regardlessofPriority,FirmwareRevision,orMAC
Address).TheswitchesareassignedunitIDsintheorderthatyoupoweroneach
switch.
Important
The following procedures assume that all switches have a clean configuration from manufacturing.
When adding a new switch to an already running stack, it is also assumed that the new switch is
using the same firmware image version as other switches in the stack.
Note: Once switch IDs are assigned, they are persistent and will be retained during a