5050 CONTROL UNIT
Technical Manual & Cabling Instructions
19.10.2012
Epec Oy reserves all rights for improvements without prior notice
Epec Oy Postiosoite/Postal address Puhelin/Phone Fax Internet
Tiedekatu 6 PL/P.O.Box 194 +358-(0)20-7608 111 +358-(0)20-7608 110 www.epec.fi
FIN-60320 Seinäjoki FIN-60101 Seinäjoki, Finland
7 APPROVALS AND SAFETY
7.1 EMC Tests
Epec 5050 control units are certified according to EMC tests that are described in this section.
The following tables provide a summary of performed EMC tests:
Emission tests according to the test specification EN 61000-6-3
Emission test Test method
Conducted disturbance at mains ports
Immunity tests according to the test specification EN 61000-6-2
Immunity test Test method
Electrostatic discharge (ESD)
Radiated radio-frequency electromagnetic field
Electrical fast transients (EFT/B)
Conducted radio-frequency common mode
Emission tests according to the E/ECE Regulation No. 10, Revision 3 (2008)
Emission test Test method Conclusion
Measurement of radiated interference field
strength
in the frequency range 30 – 1000 MHz
E/ECE Reg. No. 10,
Annexes 7 and 8
Pass
Measurement of conducted disturbances E/ECE Reg. No. 10,
Pass
1)
Limit values according to the E/ECE Regulation No. 10, Sections 6.5.2 and 6.6.2.
2)
Limit values according to the E/ECE Regulation No. 10, section 6.9.1.
Immunity tests according to the E/ECE Regulation No. 10, Revision 3 (2008)
Immunity test Test method Conclusion
Radiated radio-frequency electromagnetic field E/ECE Reg. No. 10,
Annex 9
Pass
Immunity to transient disturbances conducted
along
E/ECE Reg. No. 10,
Annex 10
Pass
2)
1)
The requirements defined in the E/ECE Regulation No. 10, section 6.7.2
2)
The requirements defined in the E/ECE Regulation No. 10, section 6.8.1.