3. MECHANICAL INSTALLATION
There must be a clearance "D between the casing
and the ceiling, depending on the size of the tool
used to access the cross-head fastening screws of the
upper casing. Consider a space of D+30 mm if the
mechanical coordinator accessory is installed
3.1 TOOLS REQUIRED
!
Use appropriate tools and equipment in working en-
vironments which comply with applicable legislation.
SET OF HEX WRENCHES
SET OF FLAT HEAD SCREWDRIVERS
SET OF PHILLIPS SCREWDRIVERS
SET OF ALLEN KEYS
SPIRIT LEVEL
DRILL
WIRE STRIPPER/CABLE LUG CRIMPER
x.x Nm
TORQUE WRENCH - if necessary for safety, a torque
wrench and the TIGHTENING TORQUE will be specified.
E.g.: HEX WRENCH 6 set at 2 Nm