EasyManua.ls Logo

FAAC A952 - Preparing the Side Cable Routing Opening; Connecting the Mains Power Cable

FAAC A952
94 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A952 45 532310 - Rev.A
1
2
3
5
4
40
1
3
2
39
3.18 CONNECTING THE MAINS POWER CABLE
The cable used must be double insulated and compliant with regulations.
The cable should only be stripped in the area between the cable clamp and the terminal.
With reference to 40:
1. Remove the plastic cover temporarily from the terminal board.
2. Locate the label that indicates the function of each terminal.
3. Connect the wires of the mains power cable (phase / neutral / earth) following the instructions on the label.
4. Secure the wires using one of the clamps provided.
5. Install the terminal board plastic cover.
3.17 PREPARING THE SIDE CABLE ROUTING OPENING
L
Do this after having installed the battery kit, if provided.
Each side cover has two openings for the installation of cable glands (39-1).
The mounting accessories include a plate (39-2) for fixing the cable gland (39-3) of the XPB SCAN sensor
(cable gland and screws supplied with the sensor):
use a drill to make the cable routing hole and the
holes for the screws.

Table of Contents

Related product manuals