Figure 92 An
iSCSI Connection for a Remote Copy between ETERNUS DX/AF Storage Systems (When
Lines Are Used) ................................................................................................................................................... 154
Figure 93 Connection Example without a Dedicated Remote Support Port....................................................157
Figure 94 Connection Example When the IP Address of the Slave CM Is Set (and a Dedicated Remote
Support Port Is Not Used)................................................................................................................................157
Figure 95 Overview of the AIS Connect Function...................................................................................................... 158
Figure 96 Security Features ................................................................................................................................................ 159
Figure 97 Connection Example with a Dedicated Remote Support Port ......................................................... 160
Figure 98 Connection Example When the IP Address of the Slave CM Is Set (and a Dedicated Remote
Support Port Is Used)......................................................................................................................................... 161
Figure 99 LAN Control (Switching of the Master CM)...............................................................................................162
Figure 100 LAN Control (When the IP Address of the Slave CM Is Set) ...............................................................162
Figure 101 Power Supply Control Using a Power Synchronized Unit (When Connecting One or Two
Servers)................................................................................................................................................................... 166
Figure 102 Power Supply Control Using a Power Synchronized Unit (When Connecting Three or More
Servers)................................................................................................................................................................... 168
Figure 103 Power Supply Control Using Wake On LAN............................................................................................. 169
Figure 104 Minimum Configuration Diagram: ETERNUS DX100 S4/DX200 S4 ...................................................170
Figure 105 Minimum Configuration Diagram: ETERNUS DX100 S3/DX200 S3 ....................................................171
Figure 106 Maximum Configuration Diagram: ETERNUS DX100 S4/DX200 S4 .................................................. 172
Figure 107 Maximum Configuration Diagram: ETERNUS DX100 S3/DX200 S3 ..................................................174
Figure 108 Enclosure Connection Path (When Only One Controller Is Installed).............................................176
Figure 109 Enclosure Connection Path (When Two Controllers Are Installed) .................................................176
Figure 110 Controller Installation Order .......................................................................................................................... 185
Figure 111 Installation Diagram for Host Interfaces (When Only One Controller Is Installed) ................... 186
Figure 112 Host Interface Installation Diagram 1 (When Two Controllers Are Installed in the ETERNUS
DX100 S4/DX100 S3).......................................................................................................................................... 186
Figure 113 Host Interface Installation Diagram 2 (When Two Controllers Are Installed in the ETERNUS
DX100 S4/DX100 S3).......................................................................................................................................... 186
Figure 114 Host Interface Installation Diagram (When Two Controllers Are Installed in the ETERNUS
DX200 S4/DX200 S3) .........................................................................................................................................187
Figure 115 I/O Module Installation Order ........................................................................................................................ 188
Figure 116 Drive Installation Diagram for High-Density Drive Enclosures .......................................................... 189
Figure 117 Installation Diagram for 2.5" Drives.............................................................................................................. 190
Figure 118 Installation Diagram for 3.5" Drives............................................................................................................... 191
Figure 119 Drive Combination 1 ...........................................................................................................................................192
Figure 120 Drive Combination 2...........................................................................................................................................192
Figure 121 Drive Combination 3...........................................................................................................................................193
Figure 122 Drive Combination 4...........................................................................................................................................193
Figure 123 Drive Combination 5.......................................................................................................................................... 194
List of Figures
8
Fujitsu Storage ETERNUS DX100 S4/DX200 S4, ETERNUS DX100 S3/DX200 S3 Hybrid Storage Systems
Design Guide (Basic)
Copyright 2023 Fujitsu Limited
P3AM-7642-32ENZ0