EasyManua.ls Logo

Fujitsu ETERNUS LT40 S2 - Replacing a Redundant Power Supply; Figure 5.8 Replacing a Redundant Power Supply

Fujitsu ETERNUS LT40 S2
110 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5 Servicing the Tape Library
5.6 Replacing a Redundant Power Supply
FUJITSU Storage ETERNUS LT40 S2/LT60 S2 LTO Library Installing, Starting Up and Maintaining
Copyright 2018 FUJITSU LIMITED P3AM-5392-07ENZ0
91
Replacing the power supply
Procedure
1 Unpack the new power supply from its package.
2 Slowly insert the new power supply into the bay, and align the connectors on the library
while supporting the power supply assembly.
3 Tighten the captive thumbscrews until the power supply is secure.
4 Replace the power cord cable.
5 Switch on power to the library (power button on the front panel).
End of procedure
5.6 Replacing a Redundant Power Supply
Figure 5.8 Replacing a redundant power supply
Procedure
1 Loosen the three screws on the library see Figure 5.8, step 1).
2 Unpack the redundant power supply from its package.
3 Slowly insert the new power supply into the bay (see Figure 5.8, step 2),
4 and align the connectors on the library while supporting the power supply assembly.
The second power supply can be installed without powering down the library.

Table of Contents

Related product manuals