EasyManua.ls Logo

Fujitsu Primergy RX300 S3 - Page 59

Fujitsu Primergy RX300 S3
113 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RX300 S3 Operating manual 59
Preparation for Use and Operation Switching the Server ON and OFF
Other ON/OFF options
In addition to the ON/OFF button, the server can be switched ON and OFF in
the following ways:
Specified switch-on time/switch-off time
The server is switched ON or OFF at a time specified in the ServerView
program.
Ring indicator
The server is switched ON via an internal or external modem.
Wake On LAN (WOL)
The server is switched on by a command via the LAN (Magic Package).
After power failure
The server automatically reboots following a power failure (depending of the
settings in the BIOS).

Table of Contents

Other manuals for Fujitsu Primergy RX300 S3

Related product manuals