EasyManua.ls Logo

GE AKTA ready - 9.2 Installing a column

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9.2 Installing a column
Introduction
The steps described in this section follow the steps in the Column Installation trail in
the ÄKTA ready Installation Wizard. Refer also to the information provided in the instruc-
tions for the chosen column.
Preparation
Before installing a column, the flow kit must be filled with liquid (e.g., distilled water) from
inlet 6 to the column valves, including the air trap. If the column is installed after a
component test, the flow kit is automatically filled and no further preparation is necessary.
ÄKTA ready Operating Instructions 28960345 AD 127
9 Column installation
9.2 Installing a column

Table of Contents

Related product manuals