EasyManua.ls Logo

GE AKTA ready - 11 Run a method

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
11 Run a method
About this chapter
Running a method on ÄKTA ready is a largely automatic procedure. User interaction is
mainly required in the preparation phase, which includes connecting the column and
the required containers, and checking that all connections are correctly assigned and
that flow kit type and volumes are correct.
Precautions
WARNING
Before attempting to perform any of the procedures described in
this chapter, you must read and understand all contents of the
corresponding section(s) in the Section 2.1 Safety precautions, on
page 15 as listed below:
General precautions, on page 15
Personal protection, on page 16
Operation, on page 19
In this chapter
This chapter contains the following sections:
See pageSection
17111.1 Final preparations before a run
17511.2 Starting a run
17811.3 Viewing and printing results
18011.4 After the run
170 ÄKTA ready Operating Instructions 28960345 AD
11 Run a method

Table of Contents

Related product manuals