EasyManua.ls Logo

GE AKTA ready - 6.1 ÄKTA ready flow kits

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.1 ÄKTA ready flow kits
Three parts
ÄKTA ready flow kits are delivered in three parts. Each of the three parts constituting the
flow path are sanitized and ready for use with the ÄKTA ready.
1
2
3
FunctionPartNo.
Tubing with 6 connectors for inlets and one for
the pump tubing.
Inlet manifold1
Double pump tubing for mounting in the peristaltic
pump, with connectors to inlet tubing and to the
main part of the flow kit tubing.
Pump tubing2
Tubing with all required flow cells (pressure, flow
meter, temperature, conductivity, and UV), air trap,
6 outlets, and connectors to pump tubing and
column.
Note:
The pH electrode is optional. For ordering informa-
tion, see Section 14.4 Ordering information, on
page 210.
Main part3
78 ÄKTA ready Operating Instructions 28960345 AD
6 Flow kit installation
6.1 ÄKTA ready flow kits

Table of Contents